Shoppers Drug Mart – Gateway Blvd

Tundra recently completed the foundation for this new Shoppers Drug Mart going up on Gateway Blvd in Edmonton. This was a fun job for us, and our first for Fillmore Construction, who we hope to work with again! We love pic #3: it showcases the difference in formwork quality between the loading dock grade beam (not exposed to view) and the ramp wall (will be visible).

 

 

 

FCL/Co-op Lumber Distribution Hub is out of the ground!

 

 

 

We love hearing how easy it is to build on our foundations! Tundra completed the grade beam for the new FCL/Co-op Lumber Distribution Hub in Fort Saskatchewan, AB with 100% accuracy on our anchor bolts. The steel erecting crew was able to place the building with zero problems!

For anyone who doesn’t know structural concrete, these high-strength anchor bolts cast into the concrete play a vital role: they transfer the loads from the steel column to the foundation. Their location needs to be extremely accurate, typically within 3 or 6mm!

We’re proud that we got it done in the middle of winter, with temperatures dropping as low as -25C. We were able to maintain our schedule despite the extra time needed to heat the formwork, rebar, and concrete while it cured.

Thanks to our client, Pemco Construction Ltd. and site superintendent Jordan Woods – you were great to work with! Looking forward to the next one!