CN Walker Rail Yard

Posted on March 19, 2021March 19, 2021 by tundrafoundations

CN Walker Rail Yard

Fueling Platform & Tank Ring Foundation

Tundra was contacted in late November to help Phoenix Petroleum with their upgrades to the CN Walker Rail Yard just north of the Yellowhead Freeway in Edmonton.

The fueling platform featured a custom structural landing adjacent to precast rail panels. The landing also incorporated an integrated curb, poured with the broom-finish landing.

The tank foundation is a large concrete ring sitting on compacted ground. Our crew had a lot of fun doing this one –our only regret is that most of the beautiful concrete will be buried!

 

Posted in Difficult Formwork, Featured Projects

Recently Featured

  • Two Edmonton Grocery Stores
  • Shoppers Drug Mart – Gateway Blvd
  • Exposed Concrete Formwork
  • FCL/Co-op Lumber Distribution Hub
  • Station Park

Categories

  • Difficult Formwork
  • Featured Projects
  • Uncategorized

Archives

  • October 2023
  • September 2023
  • July 2023
  • March 2023
  • January 2023
  • October 2021
  • March 2021
  • December 2020
  • April 2020
  • October 2019
  • July 2019
© 2022 Tundra Foundations Ltd.
Built with BoldGridPowered by WordPressSupport from InMotion HostingSpecial Thanks